Stealth Bomber Hangar

Client:

United States Navy, Naval Facilities Engineering Command

Project Location:

Andersen Air Force Base, Guam, USA

Project Scope:

Structural Engineering and Construction Engineering

Project Details:

  • 240 ft. (73.1m) clear span precast segmental folded plate arch roof structure,
  • 60 ft. (18.3m) clear height at the crown

Hangar was required to accommodate two B-2 Bombers (“Stealth” Bombers). The Hangar is completely air-conditioned.

Challenge:

Design to resist seismic Zone 4 earthquake load and 170 MPH wind load To minimize on-site casting work, speed construction and use least amount of material (concrete and rebar)

Results:

From past experience 55% savings in concrete and 40% savings in rebar are achieved using the precast folded plate roof system in comparison with conventional design using cast-in-situ concrete. Total Construction Cost: US$32.8 million (completed in 2005)

Awards:

2006 American Society of Civil Engineers (ASCE )Outstanding Civil Engineering Achievement Award
download Aircraft Maintenance Article PDF
download Aircraft Maintenance Awards PDF