B-52 Bomber Hangar

Client:

United States Navy

Project Location:

Andersen Air Force Base, Guam, USA

Project Scope:

Structural Engineering and Construction Engineering

Project Details:

  • Clear span: 73 meters 
  • Ceiling height at crown: 18.6 meters

Challenge:

To minimize expensive shoring and in situ works, to  reduce the amount of material (concrete and rebar), and to reduce construction time.

Solution:

Use of site precasting;structural design features precast arch roof segments using open folded plates.

Results:

55% savings in concrete and 40% savings in rebar quantities were realized when compared to the original design

Total Construction Cost:

US $4 million (completed in 1978)