Projects bc divider Waterfront Structures

U.S. Navy Berths B-1, B-2, & B-3

Reconstruction of Wharf

Client:

United States Navy

Project Location:

Pearl Harbor Naval Shipyard, Hawaii, USA

Project Scope:

Structural Engineering and Construction Engineering

Project Details:

The restoration, rehabilitation and reconstruction of over 2000 lineal feet of berthing space.

Solution:

Use of precast, prestressed concrete beams, slabs, and piles.

Results:

This was completed in 1968 at a total construction cost of US $5 million.