Project Location: |
Singapore |
Project Scope: |
Structural Engineering and Construction Engineering |
Project Details: |
A port facility including a 60 ft. x 322 ft. deck, dolphins, driveways and walkways. |
Challenge: |
Design of deck was required to carry 100 ton crane loads. |
Solution: |
Use of precast concrete waffle units for the construction of the deck. |
Results: |
This project was completed in 1969. Construction cost was US $900,000 |